image image image
Power Information Technology Company Ensure uninterrupted and quality power supply for all by 2015 through Improvement in generation, transmission and Distribution systems by the use of Information Technology.
Objectives Provide a fair, competitive and challenging environment to all IT solution providers so that PEPCO and all Distribution companies (DISCO’s) to benefit from the best offerings available in the marketplace.
Vision To harness  the  potential  of  Information  Technology   as  a  key  contributor in the development of Power Sector of Pakistan.

   

Water and Power Development Authority

WAPDA, the Pakistan Water and Power Development Authority, was created in 1958 as a Semi-Autonomous Body for the purpose of coordinating and giving a unified direction to the development of schemes in Water and Power Sectors, which were previously being dealt with, by the respective Electricity and Irrigation Department of the Provinces.

Since October 2007, WAPDA has been bifurcated into two distinct entities i.e. WAPDA and Pakistan Electric Power Company (PEPCO). WAPDA is responsible for water and hydropower development whereas PEPCO is vested with the responsibility of thermal power generation, transmission, distribution and billing. There is an independent Chairman and MD (PEPCO) www.pepco.gov.pk replacing Chairman WAPDA and Member (Power) who were previously holding the additional charges of these posts.

WAPDA is now fully responsible for the development of Hydel Power and Water Sector Projects.

PEPCO has been fully empowered and is responsible for the management of all the affairs of corporatized nine Distribution Companies (DISCOs), four Generation Companies (GENCOs) and a National Transmission Dispatch Company (NTDC). These companies are working under independent Board of Directors (Chairman and some Directors are from Private Sectors).

The Companies are administratively autonomous and leading to financial autonomy by restructuring their balance sheets by bringing their equity position to at least 20 percent, required to meet the prudential regulations and to facilitate financing from commercial sector (approved by ECC).The Loan Liability Transfer Agreements (LLTA) have been signed with Corporate Entities and execution of loan transfer is complete.

All Entities have the physical possessions of all their operational assets.On 24th Feb. 2007 Ministry of Water & Power notified NEPRAapproved Tariff for all Distribution Companies replacing unified WAPDA Tariff.Legal Agreements such as Business Transfer Agreements, Operation Development Agreement, Energy Supply Agreement, Business Supplementary Agreement and Fuel Supply Agreement etc. were executed between WAPDA and Corporate Entities to facilitate commercial operations. Regulatory instruments like Grid Code, Distribution Codes, Performance Standard for Distribution Companies and Transmission Companies were drafted and got  approved from (www.nepra.org.pk) in 2007.

All major lenders gave their consent for transfer of their loan from WAPDA to Corporate Entities, thus 326 loan assumption agreement were signed amongst respective Companies, WAPDA and EAD (Economic Affairs Division) GOP. CPPA is established under the coverage of NTDC for payments from DISCOs to IPPs, GENCOs and NTDC. Ultimately, it will function independently under Federal Govt. and all forthcoming IPPs will be under CPPA.

The Charter of Duties of WAPDA is to investigate, plan and execute schemes for the following fields: Generation, Transmission and Distribution of Power.

  • Irrigation, Water Supply and Drainage.
  • Prevention of Water logging and Reclamation of Waterlogged and Saline Lands.
  • Flood Management.
  • Inland Navigation.


The Authority comprises of a Chairman and three (3) Members working through a Secretary.

WAPDA is one of the largest employers of human resources in Pakistan. Over the years WAPDA has built-up a reservoir of Technical know-how and expertise which has made it a modern and progressive organization.

 

Water Wing

 In 1959, WAPDA was created to undertake the task of investigating, planning and executing schemes for irrigation, drainage, prevention of water logging and reclamation of saline land as an autonomous body responsible for integrated development of water and power resources in Pakistan. The organization was also entrusted with the work of implementing Indus Basin Settlement Plan signed between India and Pakistan in 1960 to develop replacement works for management of river water and irrigation system. Since then it has been engaged in building water development projects which include extensive research and investigation to augment country's water resources. 

Member (Water) controls the water Sector in the entire country divided into north, central, south zones, generally covering the North Western Frontier Provinces (Khyber Pakhtunkhwa) and the provinces of Punjab and Sindh respectively, for execution of SCARPs and surface water development, projects. Chief Engineers and Project Directors implement projects falling under regions within the zone. In addition, the Water Wing has a C.E (Coordination and Monitoring) for construction and operation of dams and all other projects under Water wing services (TS) and two separate General Managers for Ghazi Barotha Hydropower and National Drainage Project. The Planning Division of Water Wing, headed by a General Manager, looks after all planning activities on the water side. The activities of water resources and hydropower development and vision-2025 are handled by three General Managers i.e. Technical, South, North, GM (P&D) and GM Hydro Development.

Ongoing Projects

ONGOING PROJECTS
UNDER CONSTRUCTION DAMS
Gomal Zam Dam Project
Mirani Dam Project
Mangla Dam Raising Project
Sabakzai Dam Project
Satpara Dam Project
UNDER CONSTRUCTION CANALS
Rainee Canal Project
Kachhi Canal Project
Greater Thal Canal Project
UNDER CONSTRUCTION DRAINAGE PROJECTS
Right Bank Outfall Drain Project-I
Balochistan Effluent Disposal Into RBOD-III
UNDER CONSTRUCTION HYDROPOWER PROJECTS
Allai Khwar Hydropower Project
Khan Khwar Hydropower Project
Duber Khwar Hydropower Project
Jinnah Hydropower Project
Neelum Jhelum Hydropower Project
SMALL / MEDIUM  DAMS
Bara
Garuk
Hingol
Naulong
Pelar
Darwat
Darban
Brochure on Darban Zem Dam
Ghabir
Naigaj
Papin
Winder
Tank Zam Dam
Brochure on Tank Zem Dam
BARRAGES
Chashma Barrage
CJ-Link Canal
Chashma Right Bank Canal.



Read More

закричал "Скачать любу успенскую"Колхаун, побагровев от гнева.

Голос перешел на "Скачать новинки радио европы плюс"возбужденный шепот.

Нет, он не "Скачать игру порну"мог совершить подобную "Скачать прогу для скачивания с ютуба"гнусность!

Мне тоже, слабо "Игры на джойстик скачать"выговорил Билл.

Нужно принять факт, "Скачать линейке"что только единицы всегда "Бесплатная музыка максим скачать"побеждают и только единицы "Скачать фаерфокс последнюю версию бесплатно"могут стать победителями.

У вас "Песни из индийского фильма скачать"могут возникнуть некоторые сложности "Песня божья коровка скачать"с попаданием в него, предупредили стрелков.